Residential connection
Looking to connect a new home or single dwelling to the network? Apply for a residential connection here.
Before you start your application, please make sure you have:
- Site plans showing your property and connection point
- Your electrician’s details
- An account set up with your chosen electricity retailer (this is required before your connection can be livened).
Ready to apply?
Complete the form below to get started. Please note that from 1 April 2026, all applications must be submitted through the form below. Email applications are no longer accepted.
Final steps to get connected
Before your connection can be livened:
- Your electrician must complete and certify your installation.
- Your electricity retailer must be set up, and metering arranged.
- All connection costs must be paid.
Residential Connection FAQs
How much will my new connection cost?
Costs vary depending on the work required to get your connection livened. You’ll receive a quote outlining all costs before work begins.
What do I have to pay upfront?
From 1 April 2026, all connection costs must be paid upfront to provide clearer, more predictable pricing and align with national requirements, unless your application and quoted work were completed prior to 1 April 2026. In this case, the prior pricing structure, with costs paid at both the development and ICP application stages, will apply.
I received a quote before 1 April 2026. Will the pricing of this connection change?
If your quote expires on or after 1 April 2026, it may be reassessed under the new pricing model.
What is a capacity charge?
A capacity charge is a contribution towards the cost of providing shared network capacity to support both your connection and future demand.
How long does it take to get connected?
Timeframes depend on the complexity of your connection. Simple connections may take a few days, while more complex connections can take several weeks.
Do I need an electricity retailer before connecting?
Yes. You must have an account with an electricity retailer before your connection can be livened.
Who completes the final connection?
Your electrician completes the installation, your retailer arranges metering, and a Waipā Networks-approved contractor inspects and livens your connection.