Price Plan Guide

Permitted Price Plans

The following table shows the price plan combinations permitted for Waipa Networks.  Where a price plan is listed as ‘Closed’ this indicates that ICPs currently with that plan are permitted to  retain it (until it is eliminated) however no ICPs may change to that plan.

Price Category Fixed Price Volumetric Volumetric Options
Residential

(D)

Residential Fixed Daily

(WARF)

All Inclusive – Closed (see note 1)

(WA01)

Uncontrolled (see note 2)

(WA02)

Controlled (WA03)

Night Only (WA05)

Residential Advanced

(RA)

Residential Fixed Daily

(WARF)

Advanced Uncontrolled – Peak/Off Peak/Shoulder

(WA14/WA17/WA18)

Controlled (WA03)

Night Only (WA05)

Generation Export (see note 5(WADG) 

Advanced All Inclusive – Peak/Off Peak/Shoulder (See note 3)

(WAAI14/WAAI17/WAAI18)

Builders Temporary (see note 4)

(WABT)

General

(N)

General Fixed Daily

(WAGF)

Uncontrolled (see note 2)

(WA22)

Controlled (WA23)

Night Only (WA25)

Streetlights

(WA32)

General Advanced

(GA)

General Fixed Daily

(WAGF)

Advanced Uncontrolled – Peak/Off Peak/Shoulder

(WA34/WA37/WA38)

Controlled (WA23)

Night Only (WA25)

Generation Export  (see note 5) (WADG)

Builders Temporary (see note 4)

(WABT)

Unmetered

(U)

Unmetered Fixed Daily

(WAUM)

400V Capacity Contract

(L)

kVA – min 70kVA

(WAKV)

 

Advanced Uncontrolled – Peak/Off Peak/Shoulder

(WA54/WA57/WA58)

Generation Export (see note 5) (WADG) 

Controlled (WA23)

Notes

  1. All Inclusive was closed in 2001 – no ICPs can change to this price plan.
  2. Uncontrolled rate is not available to connections whose Initial Livening Date is after 1 April 2017 unless an AMI meter is unable to be installed to due coms issues or customer refusal.
  3. Advanced All Inclusive is only available to ICPs transitioning from All Inclusive.
  4. Builders temporary only available during construction phase only.
  5. Generation Export compulsory for all ICPs with Distributed Generation as indicated on the Registry.