Skip to content

24HR FAULTS CALL 0800 800 769

  • Get Connected
    • 1 April Connection changes
    • New connection
      • Residential connection
      • Subdivision connection
      • Commercial or industrial connection
      • Solar and distributed generation
        • Application for Export more than 10kW
        • Application for Export up to10kW
    • Changing Connections
  • Our Services
    • Contracting
    • Waikato Tree Services
    • Disconnection and reconnection services
    • Cable Locations
    • Inspections
    • Warrants for caravans
    • Our Services Terms and Conditions
  • Our Community
    • News
    • Projects
      • Mystery Creek Upgrades
      • Kihikihi Network Upgrades
    • Sponsorships
      • Level One Sponsorships
      • Level Two Sponsorships
    • Energy Efficiency
      • Community Energy Projects
      • Power Savings Calculator
  • Safety
    • Electrical emergency
    • Electrical safety
    • Safety around our network
      • Service lines
      • Our assets and infrastructure
      • Trees and power lines
      • Travelling with high loads
      • Close Approach
  • Our story
    • Our Document Library
      • Disclosures & Pricing
        • Lines Charges Explained
      • Advanced Pricing
      • Customer Discounts
      • Distribution Agreement
      • Network Connection Standards
      • Pricing Roadmap
      • Pioneer Schemes
    • Our Team
    • Our Trust
    • 100 years of Waipā Networks
    • Join our team
    • Contact Us
      • Customer Complaints
  • Outages
    • What to do if you don’t have power

Residential connection

Looking to connect a new home or single dwelling to the network? Apply for a residential connection here.


Connection costs update

Before you start your application, please make sure you have:

  • Site plans showing your property and connection point
  • Your electrician’s details
  • An account set up with your chosen electricity retailer (this is required before your connection can be livened).

Ready to apply?

Complete the form below to get started. Please note that from 1 April 2026, all applications must be submitted through the form below. Email applications are no longer accepted.

Final steps to get connected

Before your connection can be livened:

  • Your electrician must complete and certify your installation.
  • Your electricity retailer must be set up, and metering arranged.
  • All connection costs must be paid.

Residential Connection FAQs

How much will my new connection cost?

Costs vary depending on the work required to get your connection livened. You’ll receive a quote outlining all costs before work begins.

What do I have to pay upfront?

From 1 April 2026, all connection costs must be paid upfront to provide clearer, more predictable pricing and align with national requirements, unless your application and quoted work were completed prior to 1 April 2026. In this case, the prior pricing structure, with costs paid at both the development and ICP application stages, will apply.

I received a quote before 1 April 2026. Will the pricing of this connection change?

If your quote expires on or after 1 April 2026, it may be reassessed under the new pricing model.

What is a capacity charge?

A capacity charge is a contribution towards the cost of providing shared network capacity to support both your connection and future demand.

How long does it take to get connected?

Timeframes depend on the complexity of your connection. Simple connections may take a few days, while more complex connections can take several weeks.

Do I need an electricity retailer before connecting?

Yes. You must have an account with an electricity retailer before your connection can be livened.

Who completes the final connection?

Your electrician completes the installation, your retailer arranges metering, and a Waipā Networks-approved contractor inspects and livens your connection.

Need something else?

Want to apply for a different type of connection?

CLICK HERE

Looking to change an existing connection?

CLICK HERE

Have a question for our team?

CLICK HERE

Get Connected
Retailers
About Us
Contact Us
Outages
Forms
Privacy Policy

WAIPĀ NETWORKS

240 Harrison Drive,
PO Box 505, Te Awamutu
Phone: 07 872 0745

 

Social Media: Facebook | Instagram | Linkedin

(C) Waipā Networks 2018 | Website By Cube Media

Waipa Networks
  • Get Connected
    • 1 April Connection changes
    • New connection
      • Residential connection
      • Subdivision connection
      • Commercial or industrial connection
      • Solar and distributed generation
    • Changing Connections
  • Our Services
    • Contracting
    • Waikato Tree Services
    • Disconnection and reconnection services
    • Cable Locations
    • Inspections
    • Warrants for caravans
    • Our Services Terms and Conditions
  • Our Community
    • News
    • Projects
      • Mystery Creek Upgrades
      • Kihikihi Network Upgrades
    • Sponsorships
      • Level One Sponsorships
      • Level Two Sponsorships
    • Energy Efficiency
      • Community Energy Projects
      • Power Savings Calculator
  • Safety
    • Electrical emergency
    • Electrical safety
    • Safety around our network
      • Service lines
      • Our assets and infrastructure
      • Trees and power lines
      • Travelling with high loads
      • Close Approach
  • Our story
    • Our Document Library
      • Disclosures & Pricing
      • Advanced Pricing
      • Customer Discounts
      • Distribution Agreement
      • Network Connection Standards
      • Pricing Roadmap
      • Pioneer Schemes
    • Our Team
    • Our Trust
    • 100 years of Waipā Networks
    • Join our team
    • Contact Us
      • Customer Complaints
  • Outages
    • What to do if you don’t have power